混元 HY2.0 Instruct
Pricing, public benchmarks, source mapping and procurement checks in one evidence-led page.
混元 HY2.0 Instruct
Data identifier: manual/hunyuan-2-0-instruct
API pricing and context
Last observed: 2026-07-16. Vendor pages remain authoritative.
* Blended price uses 75% input and 25% output for consistent comparison. It does not represent a real workload. Basis: Official API list price.
API cost estimator
A mechanical estimate using current input and output list prices. Cache, batch discounts, retries and taxes are excluded.
Public third-party evidence
TANDIU does not run or reproduce these tests. Results are shown with their public source and model mapping.
No reliable third-party benchmark match
We did not find a public record with a sufficiently clear name and version, so no inferred score is shown. Pricing data remains available.
Observed facts versus items to validate
- Pricing and context
- Recorded from the vendor pricing source; observed 2026-07-16
- Third-party metrics
- No reliable mapping, so no inferred value is shown
- Business suitability
- No unverified industry-performance claim is made; validate with your own tasks
Confirm before a pilot
- API availability, payment and invoicing in the target region
- Data retention, training policy, hosting region and compliance
- Structured output, tool use, multimodality and version stability
- Task success rate, latency, rate limits and retry cost on real workloads
Do not rely on one score
Aggregate metrics can narrow a shortlist. Final comparisons should use the same business inputs, parameters and success criteria.
混元 HY2.0 Instruct FAQ
Short answers about the data and how to use this page.
How is the blended price calculated?
It uses 75% input price plus 25% output price as a consistent comparison basis. It is not an estimate of any specific company's bill.
Does TANDIU run the intelligence benchmark?
No. Metrics come from the labeled public third-party source. TANDIU collects the data, maps model versions and links back to the source.
Can this page determine a procurement decision?
No. Pricing and public metrics support shortlisting only. Contracts, region, compliance, features and task-level acceptance tests still need review.